Lease break in the next 18 months?

Talk to us about a workplace review, a refurbishment or a relocation while every option is still open.

Courtyard facade of the historic building housing a global tech and media company's European HQ
Knowledge / Guidance

/ Lease break or renewal? An 18-month checklist for occupiers

Lease break or renewal? An 18-month checklist for occupiers

What to do and when, working back from your break date or lease expiry, so the decision to stay or move is made on your terms.

Share
Summarise
Greg DooleyMarketing ManagerDesign and Build Content Specialist.

Greg Dooley - Marketing Manager

In Brief

  • Start 18 months before a break date or lease expiry. The legal deadlines are fixed, and a fit-out or relocation takes longer than most people expect.
  • Break clauses are applied strictly. One missed condition, such as unpaid arrears or a wrongly served notice, can tie you to the lease for years.
  • Find out early whether your lease is inside the Landlord and Tenant Act 1954, because that decides whether you have a right to renew.
  • Review how your current space is used before you decide whether to stay, shrink, grow or move.

A lease break or renewal is one of the few moments when an occupier is in a strong position to change its terms. Left late, it tends to end in a rushed renewal on the landlord’s terms or a costly dilapidations bill.

This checklist works back from the lease event. It is written for office managers, finance directors and COOs, and for the agents who advise them. It is general guidance, not legal advice. Every lease is different, so involve a property solicitor and a tenant-rep agent early.

The timeline at a glance

When Main tasks
18 months out Gather the lease documents, diary every date, check 1954 Act status, check the EPC, start a workplace review
12 months out Appoint a tenant-rep agent, review the market, get a dilapidations assessment, compare stay and relocate options
9 months out Make the decision, negotiate heads of terms, start design and landlord consents
6 months out Serve break notices or 1954 Act notices on time, confirm the fit-out programme, check all payments are up to date
3 months out Serve a section 27 notice if leaving at expiry, plan strip-out and the move, agree dilapidations strategy
Break or expiry date Give vacant possession, record the condition of the space, handle the dilapidations claim

18 months out: read the lease properly

Find the full lease and every document that changes it: deeds of variation, rent review memoranda, licences for alterations and any side letters. Licences for alterations matter later, because they often say whether you must remove your fit-out at the end of the term.

For a break clause, check these points and write them down:

  • The break date, and whether there is more than one.
  • The notice period, and the latest date notice can be served.
  • Who must serve notice, who it must be served on, and how. Many leases require notice in writing to a particular address, and email is generally not enough.
  • The conditions. Common ones are paying all rent and other sums due, giving vacant possession, and complying with covenants.
  • Any break penalty and when it must be paid.

Courts apply break conditions strictly. Small arrears can defeat a break, and a valid break notice cannot be withdrawn once served, even if both sides agree. On vacant possession, the Court of Appeal in Capitol Park Leeds v Global Radio (2021) held that it means handing back the premises free of people, belongings and third-party interests. It is not a test of physical condition, which is dealt with through dilapidations instead.

Next, establish whether the lease is inside or outside the Landlord and Tenant Act 1954, Part II. A protected lease gives you security of tenure: it continues past its expiry date until it is ended by one of the statutory routes, and you have a right to a new lease unless the landlord can prove a statutory ground of opposition. Many London office leases are contracted out, which means no right to renew. Your solicitor can confirm which applies.

Finally, check the building’s Energy Performance Certificate on the government register. More on why below.

This is also the right time to start looking at how your space is really used. A workplace consultancy study measures occupancy by zone and time of day, so you go into negotiations knowing how much space you actually need.

International law firm – Building Exterior Facade 01

12 months out: get advisers and evidence in place

Appoint a tenant-rep agent. They will tell you what comparable space costs, what incentives landlords are offering, and how strong your negotiating position is. Our London office market review gives useful background on vacancy and rents.

Ask a building surveyor for an early view of dilapidations. Surveyors in England and Wales work to the RICS professional standard on dilapidations. An early assessment lets you budget for the liability, which can be significant, and use it as a bargaining point if you decide to stay.

Under a protected lease, the formal 1954 Act window opens around now. A landlord’s section 25 notice must be given between six and twelve months before the termination date it specifies. A tenant can instead serve a section 26 request for a new tenancy, proposing a start date six to twelve months ahead. If the landlord opposes renewal, it must serve a counter-notice within two months stating its grounds.

Use the evidence from your workplace review to build the options. These usually come down to staying as you are, staying and refurbishing, taking more or less space in the same building, or relocating. Our guide on whether to stay or relocate sets out the costs and trade-offs in detail.

9 months out: decide and start negotiating

Aim to have a decision by now. If you are staying, negotiate heads of terms for a renewal or a regear, including any rent-free period or landlord contribution towards a refurbishment. If you are moving, shortlist buildings and test how your team would fit in each.

Start design work and landlord consents now. A fit-out needs time for design, pricing, a licence for alterations and the build itself. Furniture from the major manufacturers can also carry significant lead times. Our guide to how long an office fit-out takes sets out typical programmes.

Check the energy position of any building you are considering. Since 1 April 2023, landlords in England and Wales cannot continue to let non-domestic property rated below EPC E unless a valid exemption is registered, and since 2018 they have not been able to grant or renew a lease below that level (gov.uk guidance). In June 2026 the government confirmed it intends to require EPC B from 2031 for rented buildings over 1,000 square metres where cost effective, while smaller buildings stay at EPC E (interim response). This still needs secondary legislation. For occupiers, it is a sensible question to ask: what works will the landlord need to carry out during your term, and how will they affect you?

US_Investment_Firm_LARGE-13

Know how much space you need before you negotiate

A workplace review fits inside the 18 to 12 month window. We measure how your space is used and turn it into a brief your agent and your board can work from.

6 months out: serve notices on time

Many break clauses require six months’ notice, so this is often the last safe moment to serve. Serve early rather than on the final day, use the exact method the lease requires, and keep proof of service. Bear in mind that serving a valid break notice can also end your statutory protection under the 1954 Act.

Before the break date, make sure every sum the conditions require has been paid in full. Some leases require payment of rent covering a period after the break date, and there is no automatic right to a refund. Ask your solicitor whether you can recover any overpayment.

The latest date for a section 25 notice or section 26 request is also six months before the termination or start date. If you are relocating, the fit-out at the new building should now be on site or close to it.

3 months out: plan the exit

If you hold a protected lease and intend to leave at the contractual expiry date, a section 27 notice gives the landlord at least three months’ notice that you will not be renewing. Your solicitor will confirm whether one is needed.

Agree how you will deal with dilapidations. You can carry out the works yourself before you leave, or negotiate a cash settlement with the landlord. The right choice depends on cost, time and whether the landlord plans to refurbish anyway. Under section 18 of the Landlord and Tenant Act 1927, damages for disrepair are generally capped at the fall in value of the landlord’s interest, and may be nothing if the building is to be demolished or substantially altered.

Plan the move itself: IT, furniture that will be reused or disposed of, and a strip-out programme that leaves the space clear of everything you are required to remove.

An empty Cat A floor ready for fit-out
Strip-out works on site

The break or expiry date

Hand back the keys and leave the premises empty of people and belongings. Take dated photographs and video of every room, and record meter readings.

Dilapidations claims follow the Dilapidations Protocol. The landlord should generally send its schedule and a quantified demand within 56 days after the lease ends, and the tenant should usually respond within 56 days of receiving the demand. The landlord may also serve a schedule before the lease ends.

A note on reform

The Law Commission is reviewing the 1954 Act. Its second consultation paper on modernising security of tenure closed in September 2026. The current law still applies, but ask your solicitor whether any proposed changes could affect a new lease you are about to sign.

platinum-office-open-plan-desks-brass-feature-wall

What would it cost to stay and refurbish?

If staying is on the table, get a starting figure for a refurbishment so you can compare it properly with the cost of a move.

Where K2 can help

The decision between renewing and moving is easier when it rests on evidence. Our workplace consultancy, led by Mike Walley, measures how your space is used and turns that into a brief. It usually takes four to eight weeks and can be bought on its own, so it fits within the 18 to 12 month window.

If you are weighing up a refurbishment against a move, we can test both options with space planning and an early cost estimate. For a starting figure, request an office fit-out cost estimate, or book a callback to talk through your lease event.

Frequently asked questions

When should I start planning for a lease break?

Around 18 months before the break date. That leaves time to review the lease, gather evidence on how you use your space, compare options and serve notice correctly.

What happens if I miss a break condition?

Break conditions are applied strictly, so a missed condition such as unpaid arrears or a wrongly served notice can mean the break fails and you stay bound by the lease.

Do I have a right to renew my office lease?

Only if the lease is protected by the Landlord and Tenant Act 1954. Many London office leases are contracted out, which means there is no right to renew.

How do I plan for dilapidations?

Get an assessment 12 to 18 months before the lease ends. Our guide to dilapidations for office tenants explains the process.

Platinum Equity Office Design by K2 Space

Talk through your lease event with us

Tell us your break or expiry date and where you are in the process. We will help you work out what needs to happen, and when, for whichever option you choose.

Latest Knowledge